Installation Projects
8 real generator installations across 8 countries. Data centers, hospitals, mining, telecom, and industrial applications.
Tier III Data Center Backup — Riyadh, Saudi Arabia
Riyadh, Saudi Arabia · 2025 · Data Center
3× 800kW containerized Cummins QSK23, N+1 redundancy, 10.5kV output
Challenge: Data center required Tier III compliant backup power with SASO certification and 10-second ATS transfer.
Solution: Delivered 3 containerized generators with paralleling switchgear, SASO documentation, and remote monitoring. Commissioned via video call with local electrical contractor.
Result: Zero downtime during 14 grid interruptions in first year. Uptime Institute audit passed.
Hospital Life-Safety Backup — Manila, Philippines
Manila, Philippines · 2025 · Hospital
2× 400kW silent Perkins 2206C, 60Hz/480V, NFPA 110 Level 1
Challenge: Hospital needed life-safety code compliant backup for operating rooms, ICU, and emergency department.
Solution: Supplied 2 silent generators with hospital-grade mufflers (65 dB at 7m), 10-second ATS, fuel polishing system, and NFPA-compliant documentation.
Result: Passed biomedical engineering inspection on first attempt. Zero transfer failures in 8 months of operation.
Remote Mining Power — Krasnoyarsk, Russia
Krasnoyarsk, Russia · 2024 · Mining
2× 600kW containerized MTU 12V2000, -40C cold climate package, EAC certified
Challenge: Gold mining site in Siberia needed reliable prime power in extreme cold (-40C winter) with no grid access.
Solution: Customized containerized generators with engine block heaters, arctic-grade fuel systems, heated battery compartments, and double-insulated container walls.
Result: 18 months continuous operation, zero cold-start failures. Fuel consumption 15% lower than projected.
Telecom Tower Network — Kenya & Uganda
Nairobi, Kenya / Kampala, Uganda · 2024 · Telecom
25× 20-50kW silent Perkins 404D-22G, KEBS PVoC certified
Challenge: Telecom operator needed reliable backup for 25 tower sites across Kenya and Uganda, with dusty conditions and limited access.
Solution: Supplied compact silent generators with large fuel tanks (72-hour autonomy), dust-proof air intake, remote start capability, and extended maintenance intervals.
Result: 99.8% availability across all sites. Fuel efficiency 0.28L/kWh at 75% load — 12% better than previous supplier.
Textile Factory Prime Power — Faisalabad, Pakistan
Faisalabad, Pakistan · 2024 · Industrial
2× 500kW prime Cummins KTA19, 16hr daily operation, PSQCA certified
Challenge: Textile factory needed continuous prime power due to 8-12 hour daily load shedding. Previous generators failed after 3,000 hours.
Solution: Supplied 2 prime-rated generators with heavy-duty cooling, extended oil capacity, and 500-hour service intervals. Provided 2-year spare parts kit.
Result: 6,000+ operating hours with only routine maintenance. Zero unplanned downtime in 14 months.
Biogas Power Plant — Monterrey, Mexico
Monterrey, Mexico · 2025 · Gas/Renewable
1× 300kW gas generator, biogas fuel, NOM certified
Challenge: Agricultural processing plant wanted to convert waste biogas to electricity, reducing diesel consumption and carbon footprint.
Solution: Supplied gas generator with biogas-compatible fuel train, moisture separator, gas pressure regulation, and NOM-compliant documentation in Spanish.
Result: 80% reduction in diesel consumption. Plant now generates 65% of its electricity from waste biogas.
Residential Estate Backup — Lagos, Nigeria
Lagos, Nigeria · 2025 · Residential
12× 100-250kW silent generators, SONCAP certified, ATS integrated
Challenge: Luxury residential estate needed reliable backup for 200+ homes, with strict noise limits (max 70 dB at property boundary).
Solution: Supplied 12 silent generators distributed across 4 power rooms, with centralized monitoring, 72-hour fuel tanks, and automatic load sharing.
Result: Residents report near-zero noise disturbance. Estate achieved 99.5% power availability despite daily load shedding.
Electronics Factory — Binh Duong, Vietnam
Binh Duong, Vietnam · 2025 · Industrial
4× 250kW silent Cummins 6LTAA9.5, TCVN certified
Challenge: Electronics factory needed clean, stable backup power for sensitive SMT production lines. Voltage regulation must be ±1%.
Solution: Supplied 4 generators with digital AVR (±0.5% regulation), UPS-compatible output, and TCVN documentation. Delivered in 12 days from order.
Result: Zero production line interruptions during 6 grid outages. Voltage regulation exceeded specification (±0.3% measured).
Have a Similar Project?
Tell us your requirements and get a customized generator solution with factory-direct pricing.