Mission-Critical Standby Power

Custom Diesel Generator Systems for Data Centers

A data center generator is selected as part of a complete electrical system—not by matching a single kW figure. HPOWER reviews UPS behavior, cooling loads, step loading, redundancy, synchronization, fuel autonomy and site conditions before recommending the generator arrangement.

HPOWER data center backup generator system

Engineering considerations

Possible system formats

Open sets for engineered plant rooms, acoustic container packages, direct low-voltage output, project-specific medium-voltage systems and modular parallel power plants. Engine, alternator and controller brands are selected against the approved vendor list and performance requirement.

Send these documents for review

Single-line diagram, IT and mechanical load schedule, UPS information, required redundancy, voltage and frequency, load steps, maximum start time, fuel runtime, site temperature and altitude, acoustic requirement, communication protocol and applicable specification.

Request data center engineering review
WhatsAppFastest · 30-min reply EmailFor specs & drawings RFQ FormDetailed project specs
Email RFQ